Skip to content

Level master with develop (CI green) - #2

Merged
jdogresorg merged 7 commits into
masterfrom
develop
Aug 15, 2026
Merged

Level master with develop (CI green)#2
jdogresorg merged 7 commits into
masterfrom
develop

Conversation

@jdogresorg

Copy link
Copy Markdown
Contributor

Levels master with develop, which is green on every job.

Master had fallen behind after the 0.9.0 cut, so its gate was reporting an old
state rather than a real problem. This carries the current work across.

Opened alongside the other levelling PRs and merged with them: several of these
repos share byte-identical twin files, and advancing one half of a pair on its
own is what makes the other half's gate report drift.

The ratchet re-runs the unit suite, so without the siblings the tests that
read xchain-documentation skip and measured coverage lands under a floor that
was set with them running. The job had never actually run: it needs the gate,
and the gate was red for the missing sibling this same roster now supplies.
Both overrides sat one patch short of the fix: js-yaml 4.3.0 carries the
quadratic !!omap CPU consumption advisory and brace-expansion 5.0.8 the
unbounded-array DoS.
The contributor agreement says the template carries an agreement checkbox;
no template existed in any repo, so the sentence described something that
was not there.
@jdogresorg
jdogresorg merged commit f1022b2 into master Aug 15, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant