From 9d7af5574c825c2caf626b99b5d1625ceba324b0 Mon Sep 17 00:00:00 2001 From: Dmitrii Fedorov <256009718+dmitrii-f-t27@users.noreply.github.com> Date: Tue, 11 Aug 2026 18:49:23 +0700 Subject: [PATCH] docs: remove TT SKY26b delivery date and mainnet schedule MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit The TT SKY26b shuttle order was cancelled and refunded in July 2026; no Trinity die exists and none is scheduled. This repo has not been updated since 2026-05-18, so it still states a chip delivery date and a mainnet date derived from it. In a token/mining protocol repo those read as schedule commitments. deployments/base-sepolia.md:50 — "Mainnet deployment on Base L2 scheduled for Q2 2027 (post TT SKY26b silicon delivery, December 2026)" replaced with: mainnet is not scheduled, it is gated on a silicon route, the TT SKY26b order was cancelled and refunded, no route is selected. README.md:8 — "Mining requires a physical TT SKY26b Trinity chip" restated as a design requirement, with the plain statement that no such chip exists and no fabrication route is currently selected. Co-Authored-By: Claude Opus 5 --- README.md | 4 +++- deployments/base-sepolia.md | 6 ++++-- 2 files changed, 7 insertions(+), 3 deletions(-) diff --git a/README.md b/README.md index 2fb9d7a..d5c1ea1 100644 --- a/README.md +++ b/README.md @@ -5,7 +5,9 @@ [![Supply: 7.625T TRI](https://img.shields.io/badge/Supply-7.625T_TRI_(3%5E27)-gold.svg)](#tokenomics) > **One TRI token = one possible state of the Trinity silicon kernel.** -> Mining requires a physical TT SKY26b Trinity chip (Phi + Euler + Gamma). +> Mining is **designed** to require a physical TT SKY26b Trinity chip +> (Phi + Euler + Gamma). No such chip exists: the TT SKY26b order was cancelled +> and refunded in July 2026, and no fabrication route is currently selected. > No chip, no TRI. Period. --- diff --git a/deployments/base-sepolia.md b/deployments/base-sepolia.md index c854802..7d5dda1 100644 --- a/deployments/base-sepolia.md +++ b/deployments/base-sepolia.md @@ -47,8 +47,10 @@ ## Mainnet Plan -This Sepolia deployment is for testing. Mainnet deployment on **Base L2** scheduled -for **Q2 2027** (post TT SKY26b silicon delivery, December 2026). +This Sepolia deployment is for testing. Mainnet deployment on **Base L2** is +**not scheduled**. It is gated on a silicon route, and no fabrication route is +currently selected: the TT SKY26b order was cancelled and refunded in July 2026, +so no chip will be delivered. No mainnet date can be given until a route exists. For mainnet: - Genesis timestamp will be set to actual silicon ship date