You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Close the remaining Made correctness, durability, lifecycle, agent, CI, and operability gaps required before Consigliere can safely enable Made-mode delivery end to end.
This tracker does not authorize merge. Complete the child issues with focused commits/PRs and keep Made’s no-merge boundary intact.
Recommended implementation order
Phase 1 — External contracts and truthful preflight
Consigliere migration is tracked in douglasjarquin/consigliere#93 through douglasjarquin/consigliere#99.
At minimum, these Made surfaces must be stable before the dependent Consigliere work can finish:
exact high-level run submission
exact status/list/cancel
protocol/status/config schema capabilities
stage-level review decisions
verified merge completion
retry/interruption metadata
stable stage states
Integration definition of done
This tracker closes only when:
all child issues are closed with tests
Made’s canonical build/test/race/vet/lint suite is green
Ubuntu and macOS lanes are green
real GitHub CLI and real Codex release tests pass
public schemas and commands are documented and versioned
persistence migration/repair behavior is documented
Made never merges or enables auto-merge
Consigliere compatibility CI passes against the resulting Made revision
the disposable live scenarios in douglasjarquin/consigliere#99 pass
no orphan run, worktree, pane, process, socket, or submission remains after validation
Notes
Do not close this tracker based solely on unit tests or fake-backed tests. The real external contracts and cross-repository live path are release criteria.
Goal
Close the remaining Made correctness, durability, lifecycle, agent, CI, and operability gaps required before Consigliere can safely enable Made-mode delivery end to end.
This tracker does not authorize merge. Complete the child issues with focused commits/PRs and keep Made’s no-merge boundary intact.
Recommended implementation order
Phase 1 — External contracts and truthful preflight
Phase 2 — Durable lifecycle
Phase 3 — Storage, submission, and evidence
Phase 4 — Operability and release proof
Cross-repository dependencies
Consigliere migration is tracked in
douglasjarquin/consigliere#93throughdouglasjarquin/consigliere#99.At minimum, these Made surfaces must be stable before the dependent Consigliere work can finish:
Integration definition of done
This tracker closes only when:
douglasjarquin/consigliere#99passNotes
Do not close this tracker based solely on unit tests or fake-backed tests. The real external contracts and cross-repository live path are release criteria.